Hydraulically-assisted Switch Gear at Hydro Power Plant

Carried out by: Spécialité Hydraulique C.N.
Client(s): Litostroj Hydro
Date: December 4, 2001

 
After the increase of turbine power at the SM1 Hydro Powerhouse, we have completed the project to level the powerhouse gates. Our work involved the increase in size of hydraulic cylinders and also revised the safety features.