Improvement of ventilation and air conditioning in pellet plan
Design engineering and work executed. Control room, breaker room, operations employees change and lunch room.
Carried out by: AER-PRO
Client(s): Wabush Mines
Date: July 15, 2001
Project objective
Improve working environment conditions and pellet plant office comfort.
Scope of work
A Critical Path Method (CPM) was created on Microsoft-Project and presented to the customer in a technical and financial proposal. The majority of them have been executed one by one in a following sequence.
A temporary platform was installed in the control room area to facilitate work performed in heights and to allow plant normal operations to continue. Ventilation work performed in the breaker room have been completed during the winter season to prevent the breakers to overheat. A new ventilation system and air conditioning was installed in employees change and lunch room.
To customers satisfaction, Aer-Pro has completed the project respecting fixed budgets and satisfying system performance objectives.
|